Skip to content

Equipment Effectiveness (OEE) Calculator

Measure how much of planned production time is truly productive.

Planned time minus unplanned stops.

Press Calculate, or Enter in any field.

Eight-hour shift with 60 minutes of unplanned stops

800 units produced, 760 good, ideal cycle 0.5 minutes.

OEE

79.17%

Availability
87.50%
Performance
95.24%
Quality
95.00%
Fully productive time
380 minutes

Calculated from the values you entered. Formula version 1; last reviewed 2026-09-15.

What this calculator does

The product of availability, performance and quality, each measured from the shift's own records. All five inputs are measured on the line. No world-class benchmark is applied to the result.

Inputs and what they mean

Planned production time
number value.
Run time
Planned time minus unplanned stops..
Ideal cycle time
number value.
Total units produced
number value.
Good units
number value.

How to use it

  1. Enter your own figures — the calculator never fills in a rate, price or benchmark for you.
  2. Press Calculate to see the result.
  3. Read the formula, variables, assumptions and source below the result before you rely on it.

Formula

Availability = Run time ÷ Planned production time; Performance = (Ideal cycle time × Total count) ÷ Run time; Quality = Good count ÷ Total count; OEE = Availability × Performance × Quality

Worked example

Eight-hour shift with 60 minutes of unplanned stops

800 units produced, 760 good, ideal cycle 0.5 minutes.

Reading the result

The headline figure is the main answer. Any breakdown underneath shows the parts that make it up, so you can check the working and see what changes when you adjust an input.

Limitations and assumptions

Results depend entirely on the figures you enter and are rounded for display. They are for general information and education, not professional advice.

Reference: NIST MEP — Lean manufacturing measures: takt time and overall equipment effectiveness

Last reviewed:

Common questions

Formula, source and verification

The product of availability, performance and quality, each measured from the shift's own records.

The question it answers: How much of our planned production time actually produced good parts?

The formula

Availability = Run time ÷ Planned production time; Performance = (Ideal cycle time × Total count) ÷ Run time; Quality = Good count ÷ Total count; OEE = Availability × Performance × Quality

PPTPlanned production time
(min). Scheduled time excluding planned shutdowns.
RTRun time
(min). Planned time minus unplanned stops.
ICTIdeal cycle time
(min). Fastest sustainable time per unit.
TCTotal count
(count). All units produced, good and bad.
GCGood count
(count). Units meeting specification first time.

Units: Minutes and counts in; percentages out.

What kind of calculation this is

Deterministic formula. The same inputs always give the same answer. The maths is fixed and does not depend on judgement.

Method

All five inputs are measured on the line. No world-class benchmark is applied to the result.

Published alternatives

More than one published form of this calculation exists. Each one assumes something different, so the right one depends on your situation.

  • Availability × Performance × Quality (used by default)

    OEE = (Run time ÷ Planned time) × (Ideal cycle × Total count ÷ Run time) × (Good ÷ Total)

    Use it when: Use when run time and counts are recorded separately.

    It assumes: The ideal cycle time is the true best-case rate for the equipment.

  • Good parts against planned time

    OEE = (Ideal cycle × Good count) ÷ Planned production time

    Use it when: Always equivalent to the three-part form when the same figures are used.

    It assumes: The ideal cycle time is the true best-case rate for the equipment.

Assumptions built into the result

  • Operational: Ideal cycle time is the demonstrated best sustainable rate for the equipment.

Figures this calculator will never guess for you

  • No 85% world-class target or other benchmark is inserted into the calculation.

Limitations

  • A measure of equipment loss. It says nothing about demand, cost or profitability.

Source and version

Standard or reference
Overall equipment effectiveness (OEE as described in lean manufacturing guidance published by NIST MEP.)
Published source
NIST MEP — MEP guidance
Formula version
Version 1
Verification
Reviewed against the cited source on
How much weight the source carries
Standards or government
Applies to
Currency
The result is a ratio or index, so it does not depend on currency.

Related tools

Work out the hourly rate to charge a client so that target margin is met after overhead and non-billable time.

Professional & Industry

Find the true hourly cost of an employee once benefits, payroll cost and overhead are included.

Professional & Industry

Size a software application from its data and transaction functions before estimating effort or cost.

Professional & Industry

Estimate development effort, schedule and average team size for a software project of a known size.

Professional & Industry

Express cloud spend as a cost per customer, per transaction or per other business unit.

Professional & Industry

Set the rate used to apply manufacturing overhead to jobs for the coming period.

Professional & Industry