COCOMO II Effort and Schedule Calculator
Estimate development effort, schedule and average team size for a software project of a known size.
Estimated effort
465.3 person-months
- Scale exponent
- 1.0997
- Estimated schedule
- 25.9 months
- Average team size
- 18 people
- Effort per KSLOC
- 4.65 person-months
Estimate produced by a recognised estimation model, for informational purposes only. Formula version 1; last reviewed 2026-09-15.
What this calculator does
The published post-architecture equations: effort in person-months from size in thousands of source lines, then schedule from effort. The published constants are applied to the size, scale-factor sum and effort-multiplier product entered by the estimator. The calculator does not rate the project for you and inserts no calibration of its own.
Inputs and what they mean
- Size
- — Thousands of source lines of code..
- Sum of the five scale factors
- — Your own ratings for precedentedness, flexibility, risk resolution, team cohesion and process maturity..
- Product of the effort multipliers
- — Multiply your rated effort multipliers together; 1 means nominal..
How to use it
- Enter your own figures — the calculator never fills in a rate, price or benchmark for you.
- Press Calculate to see the result.
- Read the formula, variables, assumptions and source below the result before you rely on it.
Formula
E = A × Size^(B + 0.01 × ΣSF) × EM; TDEV = C × E^(D + 0.2 × (B_exponent − B)); Team = E ÷ TDEV, with A = 2.94, B = 0.91, C = 3.67, D = 0.28
Worked example
100 KSLOC project at nominal ratings
Published COCOMO II post-architecture constants applied to your ratings.
Reading the result
The headline figure is the main answer. Any breakdown underneath shows the parts that make it up, so you can check the working and see what changes when you adjust an input.
Limitations and assumptions
Results depend entirely on the figures you enter and are rounded for display. They are for general information and education, not professional advice.
Reference: SEI / USC — COCOMO II model definition manual
Last reviewed:
Common questions
Formula, source and verification
The published post-architecture equations: effort in person-months from size in thousands of source lines, then schedule from effort.
The question it answers: How many person-months and how many calendar months is this project likely to take?
The formula
E = A × Size^(B + 0.01 × ΣSF) × EM; TDEV = C × E^(D + 0.2 × (B_exponent − B)); Team = E ÷ TDEV, with A = 2.94, B = 0.91, C = 3.67, D = 0.28
- Size — Size
- (KSLOC). Thousands of source lines of code.
- ΣSF — Sum of scale factors
- (points). Sum of the five scale-factor ratings entered by the estimator.
- EM — Effort multiplier product
- (factor). Product of the effort multipliers the estimator has assessed.
- E — Effort
- (person-months). Estimated development effort.
- TDEV — Schedule
- (months). Estimated calendar duration.
Units: KSLOC in; person-months and calendar months out.
What kind of calculation this is
Estimation model. This is a published estimation model. It produces an estimate, not a measured fact, and its accuracy depends on how well your situation matches the model.
Method
The published constants are applied to the size, scale-factor sum and effort-multiplier product entered by the estimator. The calculator does not rate the project for you and inserts no calibration of its own.
Assumptions built into the result
- Operational: Size is expressed in thousands of source lines of code.
- Industry: Scale factors and effort multipliers have been rated by the estimator.
Figures this calculator will never guess for you
- No default scale factors, effort multipliers or productivity rates are supplied.
- No cost is produced without an entered rate.
Limitations
- An estimation model, not a measurement. Accuracy depends entirely on the size estimate and ratings supplied.
Source and version
- Standard or reference
- COCOMO II.2000 post-architecture model — USC CSSE (COCOMO II model definition manual, post-architecture effort and schedule equations with published constants.)
- Published source
- SEI / USC — COCOMO II.2000
- Formula version
- Version 1
- Verification
- Reviewed against the cited source on
- How much weight the source carries
- Academic
- Applies to
- Currency
- The result is a ratio or index, so it does not depend on currency.
Related tools
Work out the hourly rate to charge a client so that target margin is met after overhead and non-billable time.
Find the true hourly cost of an employee once benefits, payroll cost and overhead are included.
Size a software application from its data and transaction functions before estimating effort or cost.
Express cloud spend as a cost per customer, per transaction or per other business unit.
Set the rate used to apply manufacturing overhead to jobs for the coming period.
Find the pace of production needed to meet customer demand.