Cycle Time Calculator

Measure how long one unit actually takes on the line.

Period

Run time in the period is required.

Units produced in that run time is required.

Press Calculate, or Enter in any field.

Measured cycle time for a run

Cycle time is measured from the line. Takt time is a demand pace and is calculated separately.

Complete the required fields to see the result.

What this calculator does

Division of measured run time by measured output. No allowance, efficiency factor or standard time is applied.

Inputs and what they mean

Run time in the period
The time the process was actually running..
Units produced in that run time
number value.

How to use it

  1. Enter your own figures — the calculator never fills in a rate, price or benchmark for you.
  2. Press Calculate to see the result.
  3. Read the formula, variables, assumptions and source below the result before you rely on it.

Formula

Cycle time = Run time ÷ Units produced

Worked example

Measured cycle time for a run

Cycle time is measured from the line. Takt time is a demand pace and is calculated separately.

Reading the result

The headline figure is the main answer. Any breakdown underneath shows the parts that make it up, so you can check the working and see what changes when you adjust an input.

Limitations and assumptions

Results depend entirely on the figures you enter and are rounded for display. They are for general information and education, not professional advice.

Reference: Massachusetts Institute of Technology — 2.854 Introduction to Manufacturing Systems

Last reviewed:

Common questions

Formula, source and verification

Measured time per unit: the time the process ran, divided by what it produced in that time.

The question it answers: How fast is this line really going, how long does one unit take, and how long does an order take end to end?

The formula

Cycle time = Run time ÷ Units produced

RTRun time
(min). Minutes the process was actually running.
UUnits produced
(count). Units produced in that run time.

Units: Minutes in; minutes per unit out, also shown in seconds.

What kind of calculation this is

Deterministic formula. The same inputs always give the same answer. The maths is fixed and does not depend on judgement.

Method

Division of measured run time by measured output. No allowance, efficiency factor or standard time is applied.

Assumptions built into the result

  • Mathematical: Every quantity, time and rate is the figure the user entered, measured over the period they describe.
  • Mathematical: Times and counts refer to the same period and the same resource.

Figures this calculator will never guess for you

  • No industry benchmark, target utilisation or target availability is supplied or applied.
  • No shift length, break allowance, downtime allowance or standard rate is assumed.
  • Optional components are excluded from the result when left at zero.

Limitations

  • Arithmetic over the figures entered — it cannot tell whether the measurements behind them are right.
  • A measured result, an industry benchmark and an organisation's target are three different things; only the entered figures are used.
  • Cycle time is measured from the line; takt time is a demand pace. Comparing them is the point, and they are never the same calculation.

Source and version

Standard or reference
Manufacturing systems — throughput, cycle time, work in process and line balancing — MIT OpenCourseWare (MIT OpenCourseWare 2.854 Introduction to Manufacturing Systems — throughput is output per unit of time, cycle time is run time divided by the units produced, line capacity is set by the slowest station, and balance efficiency compares total work content with the number of stations multiplied by the longest station time.)
Published source
Massachusetts Institute of Technology — Fall 2016
Formula version
Version 1
Verification
Reviewed against the cited source on
How much weight the source carries
Academic
Applies to
Currency
The result is a ratio or index, so it does not depend on currency.

Related tools

Work out the hourly rate to charge a client so that target margin is met after overhead and non-billable time.

Professional & Industry

Find the true hourly cost of an employee once benefits, payroll cost and overhead are included.

Professional & Industry

Size a software application from its data and transaction functions before estimating effort or cost.

Professional & Industry

Estimate development effort, schedule and average team size for a software project of a known size.

Professional & Industry

Express cloud spend as a cost per customer, per transaction or per other business unit.

Professional & Industry

Set the rate used to apply manufacturing overhead to jobs for the coming period.

Professional & Industry