Calculate Economic Batch Quantity step by step: √(2DS ÷ (H × (1 − D ÷ P))).

In short

Formula: EBQ = √(2 × D × S ÷ (H × (1 − D ÷ P))), where P = production rate.

Press Calculate, or Enter in any field.

Machined part

Demand 10,000/yr, setup 200, holding 4/unit/yr, production 40,000/yr.

Complete the required fields to see the result.

What this calculator does

Calculate Economic Batch Quantity step by step: √(2DS ÷ (H × (1 − D ÷ P))). Worked example, questions and limitations included.

Use it to turn Currency (symbol only, never converted), Annual demand, Setup cost per batch, Holding cost per unit per year, and the other shown inputs into a checked result you can compare, copy, or rerun with different assumptions.

The page shows the formula, a numeric worked example, and the assumptions that affect this inventory calculation.

Inputs and what they mean

Currency (symbol only, never converted)
— choice value.
Annual demand
— number value.
Setup cost per batch
— number value.
Holding cost per unit per year
— number value.
Annual production rate
— number value.

How to use it

  1. Enter each value in the unit shown next to the box (use the unit converter first if your numbers are in other units).
  2. Check the breakdown to see every intermediate step.
  3. Read the limitations before relying on the result.

Formula

Economic production quantity model (Silver, Pyke and Thomas; ASCM dictionary).

Stock builds gradually during the run, so the batch is larger than the EOQ.

D and P must use the same time unit.

EBQ = √(2 × D × S ÷ (H × (1 − D ÷ P))), where P = production rate.

Inputs used: Currency (symbol only, never converted), Annual demand, Setup cost per batch, Holding cost per unit per year, Annual production rate.

Worked example

Machined part

  1. 1 − 10,000 ÷ 40,000 = 0.75.
  2. 2 × 10,000 × 200 ÷ (4 × 0.75) = 1,333,333.
  3. √ = 1,154.70 units.

Reading the result

The headline figure is the main answer. Any breakdown underneath shows the parts that make it up, so you can check the working and see what changes when you adjust an input.

Limitations and assumptions

  • Steady demand and production rate.
  • One product per line.
  • No setup time constraint.
  • Results are planning estimates built only from the figures you enter. No prices, rates, demand patterns or service levels are built in, and the results are not supplier quotes or carrier rates.
  • The result depends on the values you enter for this economic batch quantity calculator; it does not supply missing rates, rules, prices, dates, or assumptions for you.

Common questions

How is this different from EOQ?

EOQ assumes the whole order arrives at once; EBQ assumes it is produced over time while being consumed. Check the formula, example, and limitations on this page before using the result for a real inventory decision.

What if production barely exceeds demand?

The batch size grows very large — the line is effectively running continuously. Check the formula, example, and limitations on this page before using the result for a real inventory decision.

Does it include capacity limits?

No. Check total setup and run time with the capacity planning calculator.

How do I use the Economic Batch Quantity Calculator?

Enter the required values for Currency (symbol only, never converted), Annual demand, Setup cost per batch, Holding cost per unit per year, Annual production rate. The calculator applies the formula on this page and shows the main result with any supporting breakdown so you can check the arithmetic.

What formula does the Economic Batch Quantity Calculator use?

EBQ = √(2 × D × S ÷ (H × (1 − D ÷ P))), where P = production rate. The visible formula section above lists the calculation path and the edge cases the page handles, so the result can be checked without relying on the form alone.

Can the Economic Batch Quantity Calculator be used for exact decisions?

Use it as a calculation aid, not as a substitute for checking the underlying rule, contract, policy, or professional advice that applies to your situation. When a result depends on local rules, personal details, prices, or dates, enter those values yourself and confirm them before acting.

Related tools

Calculate EOQ step by step: EOQ = √(2 × annual demand × cost per order ÷ holding cost per unit per year).

Inventory

Calculate Reorder Point step by step: reorder point = average daily demand × lead time + safety stock.

Inventory

Calculate Safety Stock with your chosen method: fixed days of cover, z × σd × √L, or combined demand and lead-time variability.

Inventory

Calculate Inventory Turnover step by step: cost of goods sold ÷ average inventory.

Inventory

Calculate Inventory Days step by step: average inventory ÷ cost of goods sold × days in period.

Inventory

Calculate Carrying Cost step by step: capital cost + storage + insurance and taxes + obsolescence and shrinkage.

Inventory

People also use